LLC “DS-Engineering” has installed 10 frames for pylons cladding at the platform at the metro station “Maryina Roshcha” (“Sheremetyevskaya”).
Internal wall panels and stainless steel spheres have been installed at the lobby.
Internal wall panels and stainless steel spheres have been installed at the lobby.