Metro station "Rubtsovskaya" ("Electrozavodskaya")
At the Rubtsovskaya (Electrozavodskaya) metro station under construction are coming to an end works on the installation of decorative stainless steel items on the platform.

Installation of the decorative glass items in the lobby No. 2 is in full swing. The wall facing works are performed of matte curved glass 4 m high.

The lobby façade cladding of building No. 2 is under installation. Colored glass, aluminum sandwich panels, granite slabs and perforated aluminum panels are used as cladding materials.