«Pykhtino»-«Vnukovo»

At the tunnel under construction between the metro stations “Pykhtino” and “Vnukovo” LLC “DS-Engineering” began to construct roof covering and spillway channels. Installing of façade constructions of wire mesh and sun decorative aluminium slats is 60% completed.